Skip to main content

Main menu

  • Home
  • Content
    • Current
    • Ahead of print
    • Archive
  • Info for
    • Authors
    • Reviewers
  • About Us
    • About Us
    • Conflict of Interest
    • Informed Consent
    • Human and Animal Rights
  • More
    • Alerts
    • Feedback
    • Folders
  • ascls.org
    • ascls.org

User menu

  • My alerts
  • Log in
  • My Cart

Search

  • Advanced search
American Society for Clinical Laboratory Science
  • ascls.org
    • ascls.org
  • My alerts
  • Log in
  • My Cart
American Society for Clinical Laboratory Science

Advanced Search

  • Home
  • Content
    • Current
    • Ahead of print
    • Archive
  • Info for
    • Authors
    • Reviewers
  • About Us
    • About Us
    • Conflict of Interest
    • Informed Consent
    • Human and Animal Rights
  • More
    • Alerts
    • Feedback
    • Folders
  • Follow ASCLS on Twitter
  • Visit ASCLS on Facebook
  • Follow ASCLS on Instagram
  • RSS Feed
Research ArticleResearch and Reports

Using Lean 5S to Optimize MLS Laboratory Work Space

Laurie Gillard
American Society for Clinical Laboratory Science July 2018, 31 (3) 161; DOI: https://doi.org/10.29074/ascls.2018001198
Laurie Gillard
Rush University, Chicago, IL
  • Find this author on Google Scholar
  • Find this author on PubMed
  • Search for this author on this site
  • Article
  • Info & Metrics
  • PDF
Loading

This article requires a subscription to view the full text. If you have a subscription you may use the login form below to view the article. Access to this article can also be purchased.

  1. Laurie Gillard
  1. Rush University, Chicago, IL
  1. Address for Correspondence: Laurie Gillard
    , Rush University, Chicago, IL, laurie_gilliard{at}rush.edu

ABSTRACT

The Medical Laboratory Science preparation (prep) room, over time, collected obsolete equipment and outdated reagents that were no longer used. There were 2 extra refrigerators and an extra freezer, in addition to the large refrigerator and freezer already storing laboratory specimens. Objects were abandoned by former instructors when the courses they taught were completed. With multiple refrigerators and freezers running, excessive heat was generated. The heat made working in the prep room uncomfortable, not to mention the large amount of wasted energy.

To create a more pleasant and efficient work space, a Lean 5S was performed. The purpose of using Lean methodology was to identify waste and non-value-added activities. The 5S, which included sorting (removing items no longer valuable), setting in order (arranging items so they are easy to access), shining (cleaning), standardizing (how the work is done), and sustaining (to prevent the work area from deteriorating back to its previous condition), was performed at the request of the Dean of the College of Health Sciences.

The 5S required establishing a cross-functional team, which comprised the champion of the project (the Dean), the key stakeholders (the faculty members and Director of Laboratory Resources), and 2 additional team members (graduate students with “fresh eyes”). The team worked together to identify types of waste, including the waste of motion caused by people having to search for laboratory materials, the waste of energy because of running the extra refrigerators and freezers, and the waste of defective equipment and expired reagents.

The outcome of the 5S project resulted in a more efficient and productive laboratory prep room with an added benefit of creating 35% more work space.

  • Received September 24, 2018.
  • Accepted September 30, 2018.

American Society for Clinical Laboratory Science

PreviousNext
Back to top

In this issue

American Society for Clinical Laboratory Science: 31 (3)
American Society for Clinical Laboratory Science
Vol. 31, Issue 3
1 Jul 2018
  • Table of Contents
  • Index by author
Download PDF
Article Alerts
Sign In to Email Alerts with your Email Address
Email Article

Thank you for your interest in spreading the word on American Society for Clinical Laboratory Science.

NOTE: We only request your email address so that the person you are recommending the page to knows that you wanted them to see it, and that it is not junk mail. We do not capture any email address.

Enter multiple addresses on separate lines or separate them with commas.
Using Lean 5S to Optimize MLS Laboratory Work Space
(Your Name) has sent you a message from American Society for Clinical Laboratory Science
(Your Name) thought you would like to see the American Society for Clinical Laboratory Science web site.
CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.
Citation Tools
Using Lean 5S to Optimize MLS Laboratory Work Space
Laurie Gillard
American Society for Clinical Laboratory Science Jul 2018, 31 (3) 161; DOI: 10.29074/ascls.2018001198

Citation Manager Formats

  • BibTeX
  • Bookends
  • EasyBib
  • EndNote (tagged)
  • EndNote 8 (xml)
  • Medlars
  • Mendeley
  • Papers
  • RefWorks Tagged
  • Ref Manager
  • RIS
  • Zotero
Request Permissions
Share
Using Lean 5S to Optimize MLS Laboratory Work Space
Laurie Gillard
American Society for Clinical Laboratory Science Jul 2018, 31 (3) 161; DOI: 10.29074/ascls.2018001198
Twitter logo Facebook logo Mendeley logo
  • Tweet Widget
  • Facebook Like
  • Google Plus One

Jump to section

  • Article
  • Info & Metrics
  • PDF

Related Articles

  • No related articles found.
  • Google Scholar

Cited By...

  • No citing articles found.
  • Google Scholar

More in this TOC Section

  • Barriers to Implementation of Quality Management Systems in Laboratories: Lessons from the Southern Africa TB Health Systems Project
  • Polyagglutination: Lectin Isolation for T-Activated Red Cells
  • Strength of Direct Antiglobulin Test as an Indicator of Disease Severity in Autoimmune Hemolytic Anemia
Show more Research and Reports

Similar Articles

© 2025 The American Society for Clinical Laboratory Science

Powered by HighWire